Difference between revisions of "Camp for Climate Action 2008"

From HacktionLab: A UK-wide network tech-activists providing meet-ups, events, workshops, national skillshare gatherings and hacklabs
Jump to navigation Jump to search
Line 23: Line 23:
 
* Important camp information feed
 
* Important camp information feed
 
* Camp press releases
 
* Camp press releases
* Mainstream media coverage feeds  
+
* Mainstream media coverage feeds (possibly a feed of links using something like Asaph to generate them)
 
* Lastest share price ticker of E.ON (http://ir1.euroinvestor.com/irstaticcharts/eon_xetra.png)
 
* Lastest share price ticker of E.ON (http://ir1.euroinvestor.com/irstaticcharts/eon_xetra.png)
  
 
==== Proxy ====
 
==== Proxy ====
  
The web portal should also provide a caching web proxy (squid) so that bandwidth demands are reduced and apparent speed increased.  
+
The web portal should also provide a caching web proxy (squid) so that bandwidth demands are reduced and apparent speed increased.
  
 
=== Internet Connectivity ===
 
=== Internet Connectivity ===

Revision as of 11:22, 14 July 2008

Be The Media

Last year, the media team was part of the networking working group and the alt media provision was not a working group at all but simply a bunch of people pitching in under the indymedia brand. This year, there is a media working group operating under the banner 'be the media'.

What's Planned

Basically it's all the normal provision of an Independent Media Centre along with the facilities required by the media team to liaise with the main stream media. This includes some kind of provision of an open access internet suite, space and facilities for audio and video editing, reporting lines, collection of daily newspapers.

There will be a radio studio producing daily live and recorded content, streamed on the internet and broadcast throughout the camp so that people in neighbourhoods can stay informed.


Web portal

The CCA web portal will be served out on site from a web server running on the BW LTSP server laptop. It should contain the following information skinned to match the CCA website itself:

Proxy

The web portal should also provide a caching web proxy (squid) so that bandwidth demands are reduced and apparent speed increased.

Internet Connectivity

Satellite from psand

supplemented if possible by 3g routers (three or t-mobile pay-as-you-go)



Workshops & Training

Workshops will be run daily in the media space on the days of the 4th, 5th, 6th, 7th, 8th and/or 9th August.

These include the media training workshops run by the media team.

Please put your availability in dates when you are putting down details of workshops. Also please only put down workshops that are confirmed when you know for sure that you or the person leading the workshop can definitely do them.

DEADLINE IS WED 16TH JULY

Workshop Times

  • 4th Monday 11 am: Security, privacy and encryption.
  • 5th Tuesday 11 am: 12 volt workshop
  • 6th Wednesday 11 am: Free Space
  • 7th Thursday 11 am: Digital Photography Workshop
  • 8th Friday 11am: Putting your Media online and explore alt.media Distribution Channels

Proposed Workshops

Reassessing our approach to media

Facilitator: Ben

Length: 60 - 90 mins

reassessing alternative media and activist relations with the mainstream - our goals and how well we've achieved them

Content of media - what we want

Facilitator: Ben

Length: 60 - 90 mins

Content issues - spectacle, conflict and binary reporting in alt media vs depth, document ion, issues and solutions

Phones as tools for change

Facilitator: Ben

Length: 60 mins

Mobile phones as a reporting, organising and communication tool, including SMS, and asterisk automated voice systems.

Security, privacy and encryption

Facilitator: Mike Harris

Length: 60-90 mins

Description: a workshop to cover concepts such as computer security, logins, passwords, mailing lists, wikis and forums, what is and isn't private, how to encrypt your data using GNU Privacy Guard (GPG), secure connections using ssh and SSL. Will focus on Linux, but also consider Windows and Mac.

Taking, editing & publishing better direct action photographs.

Facilitator: John Kriptic

Length 2 hours

Description: Improving the quality of DA pics for Indymedia & other DIY sites & publications. How pics of even tame actions can, with more thought to composition, viewpoint, framing & technical camera knowledge can be turned into interesting & dynamic pics, avoiding common faults. Many examples of good & bad pics.

Putting your Camcorder video online - a basic guide

Faciliator: mickfuzz

Length: 60 mins

Description: A short guide to capturing and getting your video online. Using Avidemux and other appropriate capturing tools.

Creating a Video Channel

Facilitator: mickfuzz

Length: 45 mins

Description: A short guide to distributing your video work with a Video podcast. Looking at the Miro player and Channel guide, RSS2 (with enclosures), Wordpress.com, Blip.tv, and Archive.org. We'll look at these free online resources and talk about strategy for getting video work more audience.

12 volt and renewables workshop/walkabout

Facilitator: Ray-Mundo

Length: 1 hour approx

Description: Ray will talk about solar panels, wind generators, different types of batteries, accessories, strategies for getting the charge-storage-usage equation right (e.g. how many panels, how many batteries, how much supply for how long). This workshop may well involve a short introduction at the Be The Media tent followed by a walkaround site to look at the various installations from a practical viewpoint.

(Is this duplicated elsewhere or better done elsewhere?)

Infrastructure

Marquee Spaces

It looks like camp structures group have agreed to supply the following: 1x 20ft x 40ft (for our main space) 2x smaller gazebo type structures (for an offsite media space, and a video studio space)

Additionally we have access to two 6m x 4m tents that could be used individually or buttressed together with some form of guttering kit.

We were hoping to have a single public space, sufficient the house all or most of the following inside:

  • public internet space
  • photo/video/news desk for grass roots media groups
  • contact point for camp media
  • meeting space / daily news papers

One or more of the 6m x 4m party tents could be put up behind the main tent to use as the 'back stage', private areas for studio space, meetings, interviews, and escaping. The dedicated spaces required include the following:

  • radio studio (quiet'ish, off to the back space)
  • video studio (quiet'ish, off to the back space)
  • media liason (a kind of reception space I guess. to meet journalists and reduce the chance of them wandering around working space)
  • off site covered space for mainstream media interviews outside of the two hour media access slot.

Power Requirements

Previous years have proved that this space is by far the single biggest user of power on site. We are estimating that the space will consume between 200 and 800 watts of power during the whole time.

That means 200 watts at minimum times running the satellite conx, some wifi, voip phones, and a couple of laptops for newswire or for the media team in a kind of back office set-up. And 800 watts on a day of action with lots of public access and lots of people editing and uploading and newswiring.

The power working group should be included in the loop on this.

Provider Type/set-up Max hours @ 200w Max hours @ 800w
Sat Van built-in 12volts x 220Ah, 2 x 85w panels
Ben 6 x 100Ah 12v batteries, 2 x 80w pv, 2 x 30w pv, 4 x 10w pv, 20amp pv regulator, 600w cont invertor, 300w cont invertor, wind turbine 200w@6m/s plus dump regulator,
Sam UNTESTED - Brand new rig, Batteries in a slightly unknown state. 24v/ 240v x 2000ah. 340w panels. 1kw wind turbine. Inverter rated 3kw.

Comms Provision

(in addition to the provision of two ways radios etc by the comms group.)

public phone lines

Info line number

Mostly used in early days with recorded info such as directions to camp, shuttle bus locations and times, tide info etc. It is unlikely that this would be updated much as the sms systems are better for dynamic up-to-date info. Additionally there would also be the option to be forwarded from this number to the others mentioned below.

This should be a local rate number and the caller would pay their standard call rate for making these calls. There would be no cost incurred by the camp.

Press enquires number

For mainstream media press enquires which forward to the mobiles of the media team. It will allow multiple simultaneous incoming calls to the single number and ring whichever phones are not already engaged, one of which will hopefully be answered.

Ideally, the number would be a premium rate number so that the caller (the corporate media) cover the cost of forwarding the call and the camp doesn't pick up any of the cost.

Reporting line number

Used by activists in the field to report or update on actions/incidents. This incoming info is used by alt media coverage, sms alerts and keeping the media team informed etc. Callers have the option to leave a recorded message for publication on indymedia and use by the radio team etc. ie. audio reports/interviews. Callers may also hop across to the options provided by the info line. Additionally there would be the option to be forwarded to the legal support number for reporting arrests etc.

This should be a local rate number and rhe caller would pay their standard call rate for making these calls. Any calls forwarded to mobile phones would incur call charges to the camp amounting to roughly 10 pence per minute.

open SMS alerts

(using twitter.com)

camp bulletins

People sign up to this to receive bulletins relating to on site news such as changes to programme, emergency meetings, call outs for volunteers by working groups, etc.

action alerts

People sign up to this to receive bulletins about actions / incidents taking place (mostly) outside of the camp. It would be useful to anyone needing to stay informed about the big picture during actions days, be it people on the media team, legal support, journalists, or anyone else to whom up-to-date information would be useful or desirable.

working group sms systems

(probably using twitter)

legal support

An sms group for the legal support team which would enable them to effectively contact each other with things like requests for help/replacements etc.

media team

An sms group for the media team which would enable them to effectively contact each other with things like requests for somebody to speak to a camera crew at the main gate for example.

police liaison

An sms group for the police liaison team which would enable them to effectively contact each other with things like requests for liaison at an emerging confrontation/incident.

spokescouncil sms

An sms group of all the neighbourhood dedicated phones in order to alert on call spokes to come to a spokes meeting (this might be duplicated by the camp bulletin alerts).


On site phone system

A system of hard wired phones will be installed in key spaces to compliment the onsite two way radio system. This will consist of phone extensions located in key central infrastructure spaces; comms, the gate, media space, legal support, and the site office etc Use of this system will reduce clutter and traffic on the two way radio which means less stuff for the cops to listen with and less crap the people with radios need to listen to which is irrelevant to them.

There are no costs involved in using the on site radio unless we choose to provide facilities to dial an outside line in which case calls would be the same as whatever the cheapest pay as you go mobile phone tariff available.

Other Resources